Residential solar installation takes 1–3 days on-site but 4–12 weeks total including permits and utility interconnection. Understanding the process helps you plan and avoid delays.
Installation timeline
- 1. Site survey & design (1–2 weeks)
- 2. Permits & HOA approval (2–6 weeks)
- 3. Installation (1–3 days)
- 4. Inspection & PTO (2–4 weeks)
- 5. System live — monitoring begins
Permits & interconnection
Your installer handles permits. Utility interconnection agreement is required before grid export.
Solar costs by state
Frequently Asked Questions
How long until my system runs?
Typically 6–12 weeks from contract to permission to operate.